FacebookTwitter

Here’s a few shots of the installation – a nerve wracking experience but handled with great expertise, care and attention to detail by ng developments. They also managed to manoeuvre the very very very heavy 2.5m high glass panels into place without even a flinch! Thanks chaps, we were very impressed!

Each panel was crated for transportation. They were so heavy we had to rig up a roller system to move them around.

First unveiling. Everything intact!
Then assembly and manoevring into position. Easy!

Leave a Comment

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>